OKR10 Stormwater ARC 2012 (5)
OKR05 Stormwater Sensitive Areas (6)
Watershed Boundary HU12 (7)
Land Application Sites (8)
NPDES Dischargers (9)
PWS Surface Water Intakes (10)
PWS Wells (11)
Total Retention Facilities (12)
Wellhead Protection Areas (WHPAs) (13)
Completed TMDLs 2014 (14)
Lake Thunderbird Watershed (15)
WHPA 300ft Buffer (16)
2022 IR Waterbodies (23)
2022 303d Waterbodies (24)
| 4a |
| 5 |
2022 Completed TMDLs (25)
Appendix B Areas (26)
Appendix B Lines (27)
Appendix H Groundwater Sites (28)
Draft 2024 303d Waterbodies (29)
Draft 2024 305b Waterbodies (30)
Draft 2024 Completed TMDLs (31)
|